Our Work Process
Haya’s primary goal in fit-out design is to ensure proper planning to execute and deliver the assigned project as early as possible. The fit-out includes delivering the required building equipment like decoration, fittings and interiors.
Let’s check out how Haya interior plans and executes its work to meet the client’s expectations in the step-by-step procedure below.
1. Pre-construction activities
The foundation of a successful construction project is covered under the pre-construction stage. The main aim of this phase is to deliver a complete, accurate and reliable source of information to the clients since such information gives way to the respective team to make precise decisions on cost, schedule and the quality of the services.
2. Site inspection, space planning and interior design
The following process includes site monitoring, review of existing facilities, waste management, site components and study of building guidelines. Design and space planning is also included in this process. Our proficient team pays extra attention to its development as it is one of the most incredible opportunities to attract and please the occupants. Besides that, meetings with consultants are done in this phase. In addition, our experts study and evaluate the project’s feasibility to optimize the time and budget.
3. Budget, permits and license
In this process, our team and client estimate the possible fit-out construction cost to prevent the following downfalls like overpaying, cost overruns, loss of money and falling of the project. In addition, some mandatory permits and licenses are required to proceed with the construction process. The required permit includes electrical, plumbing, fire management and safety licenses.
4. Construction activities
In this stage, actual construction work takes place. The contractor’s team needs to go with the detailed execution program since it includes all the approvals and time frames for each process.
5. Meeting, monitoring and actual work
Regular meetings are conducted to avoid miscommunication during the construction process—such as site progress, design perspective issues and other related concerns discussed in the meeting. However, the work of fit-out professionals includes cabling, drainage, mechanical, sanitary, and fire protection.
6. Post-construction activities
The last step is practical completion or handover, which means the space is ready and available for use by the occupants after the finishing touches and the final inspection.
Commercial interior design and fit-out require an expert workforce to plan and prepare everything to achieve the desired results. To get professional services from Haya interiors, the best interior design and fit-out companies in Abu Dhabi, connect with us today.